Headlines

Watch NASA roll huge Artemis 1 moon rocket off the pad Friday

Share with:


Loading

Watch NASA roll huge Artemis 1 moon rocket off the pad Friday

By Mike Wall published 1 day ago

Rollback is expected to begin at 11 p.m. EDT on Friday (July 1).

https://youtube.com/watch?v=bFKRjDpzIII

NASA plans to start rolling its Artemis 1 moon mission off the launch pad on Friday evening (July 1), and you can watch the slow-moving action live.

The Artemis 1 stack — a Space Launch System (SLS) rocket topped by an Orion crew capsule — is expected to depart Pad 39B at NASA’s Kennedy Space Center (KSC) in Florida at 11 p.m. EDT on Friday (0300 GMT on Saturday, July 2), pending good weather. The duo will head toward KSC’s cavernous Vehicle Assembly Building (VAB), making the 4-mile (6.4 kilometers) trip in eight to 12 hours atop NASA’s enormous crawler-transporter 2 vehicle.

You can watch at least some parts of the rollback live here at Space.com, courtesy of NASA. The agency will provide webcast coverage(opens in new tab) “of the rocket departing the launch pad and arrival at VAB,” NASA officials wrote in a recent update(opens in new tab).

Sponsored Links

Freelancers Could Qualify For These Small Business CardsNerdWallet

Related: NASA’s Artemis 1 moon mission explained in photos

Click here for more Space.com videos…

https://imasdk.googleapis.com/js/core/bridge3.520.0_en.html#goog_1376438510

0 seconds of 1 minute, 8 secondsVolume 0%

PLAY SOUND

Artemis 1 recently wrapped up its “wet dress rehearsal,” a crucial series of tests and simulations designed to help determine a vehicle’s readiness for flight. This wet-dress success was hard-won; the Artemis 1 team first tried to notch the milestone in early April but were thwarted by several technical issues, including a stuck valve. Team members ended up rolling the stack back to the VAB for repairs on April 25, then sent it to the pad for another attempt earlier this month.

The latest try did not go perfectly smoothly — a hydrogen leak was discovered during fueling operations — but NASA officials deemed it good enough to start preparing Artemis 1 for liftoff.

RELATED STORIES:

 NASA’s Artemis program of lunar exploration (reference) Artemis 1: Going back to the moon
 For Artemis moon missions, science will reign supreme

Artemis 1 will send an uncrewed Orion on a roughly month-long journey around the moon. The mission team is apparently eyeing late August or early September for the liftoff, but an official target date won’t be set until SLS and Orion have been inspected fully back at the VAB. 

Share with:


Verified by MonsterInsights